The excavation is the first process when starting a construction site, in which the soils are removed reaching the formation specified in the geological survey. This process is carried out by adhering to all the suggestions in the constructive project. Always before starting excavation we make sure to maintain the stability of border objects and surface water drainage. Excavation is carried out by applying 1:1 ratio for the inclination of the slopes
Kontakt
A Pasho Hysa Nr 26 0714 AL 1004 Tirana
C +355684049444 E info@kontakt.al
W kontakt.al
.